Apply / Workload first, access later

Put your maintenance chase into operating numbers.

Model the routine coordination load using assumptions you control, then prepare a company-level application for the deidentified 20-work-order audit.

Local calculation · no email gate · no resident data · no promised savings

Resolution-load calculator

What does routine coordination currently consume?

Use your portfolio and operating assumptions. The illustrative automation share is a scenario control—not a claim that Korrd will automate or recover that share.

doors
Use the portfolio that would be inside the scope—not the whole company if different.
WOs / 100
Exclude emergencies, turns, inspections, and work you would never coordinate through Korrd.
%
The audit determines real eligibility. This input is only your initial estimate.
minutes
Include vendor and resident chase, scheduling, status, evidence, approval, and closeout handling.
$/ hour
Use your own wages, payroll burden, management overhead, or internal cost convention.
Capped at 80% to keep exceptions and human-controlled work visible. This is not a forecast.

Illustrative model · your inputs · no data sent.

Request the 20-work-order audit

Check the operating shape before sharing any records.

This form creates a local, copyable application summary. It does not upload your answers because a production form endpoint has not been configured.

Company-level geography only. Do not enter property addresses.
Do not include resident or confidential operational data.

This application does not need work orders, names, phone numbers, addresses, recordings, invoices, credentials, API keys, or vendor bank information.